Manhole Rehabilitation Project

Share Manhole Rehabilitation Project on Facebook Share Manhole Rehabilitation Project on Twitter Share Manhole Rehabilitation Project on Linkedin Email Manhole Rehabilitation Project link

Project was completed on April 11.

The City of Avondale Public Works Department is beginning construction on a manhole rehabilitation project from October 10, 2023, through Spring 2024 in partnership with contractor JPCI Services.

The project will involve excavation, removal of old manholes, installation of new ones, and street restoration citywide. Construction activities will occur primarily from 6 a.m. to 4 p.m. on weekdays, with occasional night or weekend work. Sewer and water services will remain uninterrupted throughout the project and efforts will be made to minimize noise and dust disturbances during construction.

The following areas are included in the project:

  • Fairway Dr: Woodland Ave. - Coldwater Springs Blvd.
  • Lower Buckeye Rd: El Mirage Rd. - Avondale Blvd.
  • 119th Ave: Encanto Blvd. - Monte Vista Rd.
  • Garden Lakes Pkwy: Lakeshore Dr. - Thomas Rd.
  • Central Ave. / Rio Vista Ln.
  • Thomas Rd. / Dysart Rd.

Residents and motorists are asked to follow traffic control signs for safety during the project period. For more details, call the Project Information Line at (623) 218-4500 or visit www.avondaleconnect.org to provide comment, or to view public notices and maps of the rehabilitation project.

The City of Avondale Public Works Department is beginning construction on a manhole rehabilitation project from October 10, 2023, through Spring 2024 in partnership with contractor JPCI Services.

The project will involve excavation, removal of old manholes, installation of new ones, and street restoration citywide. Construction activities will occur primarily from 6 a.m. to 4 p.m. on weekdays, with occasional night or weekend work. Sewer and water services will remain uninterrupted throughout the project and efforts will be made to minimize noise and dust disturbances during construction.

The following areas are included in the project:

  • Fairway Dr: Woodland Ave. - Coldwater Springs Blvd.
  • Lower Buckeye Rd: El Mirage Rd. - Avondale Blvd.
  • 119th Ave: Encanto Blvd. - Monte Vista Rd.
  • Garden Lakes Pkwy: Lakeshore Dr. - Thomas Rd.
  • Central Ave. / Rio Vista Ln.
  • Thomas Rd. / Dysart Rd.

Residents and motorists are asked to follow traffic control signs for safety during the project period. For more details, call the Project Information Line at (623) 218-4500 or visit www.avondaleconnect.org to provide comment, or to view public notices and maps of the rehabilitation project.