Pavement Management Program

Share Pavement Management Program on Facebook Share Pavement Management Program on Twitter Share Pavement Management Program on Linkedin Email Pavement Management Program link

The of Avondale is actively enhancing its road network to ensure connectivity, safety, and economic growth. The network includes around 290 miles of roadway, with replacement costs for major roads ranging from $5-$6 million per mile. Due to these high costs, extending the lifespan of current roads is crucial.

To manage this, the city has implemented a Pavement Management Program (PMP), following guidelines from the American Public Works Association. This program focuses on efficient resource use, cost reduction, and extending pavement life by applying both traditional and innovative preservation methods. Regular assessments determine maintenance needs and prioritize repairs to maintain streets effectively while optimizing expenditures.


For more information on the City of Avondale’s Pavement Maintenance Program visit our site by clicking the following link.

Pavement Maintenance Program | City of Avondale

The of Avondale is actively enhancing its road network to ensure connectivity, safety, and economic growth. The network includes around 290 miles of roadway, with replacement costs for major roads ranging from $5-$6 million per mile. Due to these high costs, extending the lifespan of current roads is crucial.

To manage this, the city has implemented a Pavement Management Program (PMP), following guidelines from the American Public Works Association. This program focuses on efficient resource use, cost reduction, and extending pavement life by applying both traditional and innovative preservation methods. Regular assessments determine maintenance needs and prioritize repairs to maintain streets effectively while optimizing expenditures.


For more information on the City of Avondale’s Pavement Maintenance Program visit our site by clicking the following link.

Pavement Maintenance Program | City of Avondale

  • FY25 Spring Pavement Program

    Share FY25 Spring Pavement Program on Facebook Share FY25 Spring Pavement Program on Twitter Share FY25 Spring Pavement Program on Linkedin Email FY25 Spring Pavement Program link

    The City of Avondale Public Works Department, in partnership with Weems Asphalt, VSS International, and MR TANNER will be undertaking various Surface Treatment Projects in selected subdivisions and Arterials as part of the FY25 pavement preservation program. This project is approximately scheduled to take place from April 14th - Jume 30th

    Bulk trash services will be unaffected; collections will occur early in the morning within the project areas. Please ensure bulk trash is placed out by 5 AM on Monday during your service week.

    Expect lane restrictions and closures throughout this period. To minimize disruption, signage will be placed before work begins, and door hangers will be distributed 48 hours prior to any activity. Work hours are from 7:00 AM to 5:30 PM, Monday through Friday. Vehicles left in the work zones risk being towed at the owner's expense.

    Please note that the schedule may change due to unforeseen factors such as mechanical issues, weather conditions, or material supply delays. The safety of the public is our highest priority throughout this project.

    An overview of the project sequence has been provided below. A more detailed map will be delivered to impacted households approximately 3 days prior to the start of work. For questions or more details, please call Public Works at 623-333-4487.

    The maps below outline the sections that will be addressed in the Spring Pavement Program. Dates for VSS will be added once the contractor provide them.


    MR TANNER

    • Crack Seal
      1. Oak Park - March 26th and 27th
      2. Verde Trails - March 26th and 27th
      3. Alamar - March 26th and 27th
      4. Rancho Santa Fe - March 26th and 27th
    • Seal Coating
      1. Oak Park – April 21st - 22nd
      2. Verde Trails – April 23rd – June 1st
      3. Alamar – April 23rd – June 6th
      4. Rancho Santa Fe – June 5th – 6th

    VSS

    • Micro Surface
      1. Westwind, Micro Surface - April 14th, 15th, 16th, 17th, and 18th
      2. Crystal Gardens, Mirco Surface - April 16th, 17th, 18th, 21st, 22nd, 23rd, and 24th
      3. Garden Trails, Micro Surface - April 15th, 17th, 18th, 21st, 22nd, 23rd, and 24th
      4. Rio Vista, Micro Surface - April 21st, 22nd, 23rd, and 24th
      5. Osborn Rd, 132nd Ave, Indian School to Dysart Rd, Micro Surface - April 14th, 15th, and 16th
      6. El Mirage Rd, just north of Indian School, Micro Surface - April 14th
      7. 103rd Ave, Encanto Blvd to Mc Dowell Rd, Micro Surface - April 17th,18th, and 21st

    Weems Asphalt

    • Mill and Overlay - Central Ave “Western Ave to MC85”
      1. Lower Utilities - May 22nd
      2. Milling – May 27th – 28th
      3. Paving – May 29th
      4. Raise Utilities – June 2nd
      5. Temp Striping – June 3rd
      6. Thermo Striping – June 30th

    ViaSun

    • Micro - Hilton Dr, Hilton Wy, Hotel Wy, & 112thDr
      1. Crack Seal – April 2nd – 3rd
      2. Micro Surface – April 28th – 29th
      3. Temp Striping – May 1st



  • Fall 2024 Crack Seal & Surface Treatment Projects - Fall Schedule Completed

    Share Fall 2024 Crack Seal & Surface Treatment Projects - Fall Schedule Completed on Facebook Share Fall 2024 Crack Seal & Surface Treatment Projects - Fall Schedule Completed on Twitter Share Fall 2024 Crack Seal & Surface Treatment Projects - Fall Schedule Completed on Linkedin Email Fall 2024 Crack Seal & Surface Treatment Projects - Fall Schedule Completed link
    Fall Schedule Completed


    The City of Avondale Public Works Department, in partnership with Weems Asphalt and VSS International, will be undertaking various Surface Treatment Projects in selected subdivisions and Arterials as part of the FY25 pavement preservation program. This project is scheduled to take place from September 3rd to December 6th.

    Bulk trash services will be unaffected; collections will occur early in the morning within the project areas. Please ensure bulk trash is placed out by 5 AM on Monday during your service week.

    Expect lane restrictions and closures throughout this period. To minimize disruption, signage will be placed before work begins, and door hangers will be distributed 48 hours prior to any activity. Work hours are from 7:00 AM to 5:30 PM, Monday through Friday. Vehicles left in the work zones risk being towed at the owner's expense.

    Please note that the schedule may change due to unforeseen factors such as mechanical issues, weather conditions, or material supply delays. The safety of the public is our highest priority throughout this project.

    An overview of the project sequence has been provided below. A more detailed map will be delivered to impacted households approximately 3 days prior to the start of work. For questions or more details, please call Public Works at 623-333-4487.

    The project under WEEMS ASPHALT have been completed. The projects under VSS have been partially completed, the crack seal has been completed in the scheduled locations. The treatments have been moved to the Spring of 2025, due to current temperatures. We will update the Project Sequence as soon as we have those projects dates.

    Project Sequence

    WEEMS ASPHALT

    Del Rio Ranch Unit 2, Crack Seal – 9/3 to 9/6 - Completed

    Del Rio Ranch Unit 2, Surface Treatment – 9/23 to 9/30 - Completed

    Durango Park, Crack Seal – 9/9 to 9/12 - Completed

    Durango Park, Surface Treatment – 9/23 to 9/30 - Completed

    Los Arbolitos, Crack Seal - 9/13 to 9/20 - Completed

    Los Arbolitos, Surface Treatment – 10/1 to10/9 - Completed

    Ranchette Estate, Crack Seal – 9/23 to 9/25 - Completed

    Ranchette Estate, Surface Treatment – 10/10 to 10/15 - Completed

    Coldwater Springs, Crack Seal Parcels 15, 16, 17 – 9/26 to 10/1 - Completed

    Coldwater Springs, Crack Seal Parcels 15, 16, 17 – 10/16 to11/19 - Completed

    Glenhurst, Crack Seal – 10/2 to 10/4 - Completed

    Glenhurst, Surface Treatment – 10/28 to 10/31 - Completed

    Irving Pl & Hills Subdivision, Crack Seal – 10/7 to 10/11 - Completed

    Irving Pl & Hills Subdivision, Surface Treatment – 11/1 to 11/8 - Completed

    Roosevelt Park Unit 1, Crack Seal – 10/14 to 10/17 - Completed

    Roosevelt Park Unit 1, Surface Treatment – 10/28 to 10/31 - Completed

    Tierra @ Rancho Santa Fe, Crack Seal – 10/18 to 10/23 - Completed

    Tierra @ Rancho Santa Fe, Surface Treatment – 11/11 to 11/15 - Completed

    Whyman Ave, Crack Seal – 10/24 to 10/24 - Completed

    Whyman Ave, Surface Treatment – 11/18 to 11/19 - Completed

    VSS INTERNATIONAL

    Osborn Rd, 132nd Ave to Dysart, Crack Seal – 9/4 - Completed

    Westwind, Crack Seal – 9/5 to 9/12 - Completed

    Earll Dr, 107th Ave to 106th Ave, Crack Seal – 9/12 - Completed

    Crystal Gardens, Crack Seal – 9/13 to 9/16 - Completed

    Garden Trails, Crack Seal – 9/17 - Completed

    Rio Vista, Crack Seal – 9/18 to 9/19 - Completed

    103rd Ave, Encanto Blvd to McDowell Rd – 9/20 - Completed

    El Mirage Rd, Indian School to City Limits – 9/23 - Completed

    VSS Micro Surface Treatment Schedule

    Osborn Rd, 132 Ave from Indian School Rd to Dysart Rd – Spring 2025

    El Mirage Rd, Indian School Rd to North City limits - Spring 2025

    Crystal Gardens, Spring 2025

    Garden Trails, Spring 2025

    103 Ave, McDowell Rd to Encanto Blvd – Spring 2025

    Westwind, Spring 2025

    Rio Vista, Spring 2025





  • Asphalt Repairs - 1/2/2025 - 1/8/2025 - This project is completed.

    Share Asphalt Repairs - 1/2/2025 - 1/8/2025 - This project is completed. on Facebook Share Asphalt Repairs - 1/2/2025 - 1/8/2025 - This project is completed. on Twitter Share Asphalt Repairs - 1/2/2025 - 1/8/2025 - This project is completed. on Linkedin Email Asphalt Repairs - 1/2/2025 - 1/8/2025 - This project is completed. link
    This project was completed

    As part of the FY25 pavement preservation program, The City of Avondale Public Works Department and MR TANNER, will be completing asphalt repairs to the following subdivisions. This work is scheduled from January 1st, 2025, to January 8th, 2025. Expect lane restrictions and closures throughout this period. To minimize disruption, signage will be placed before work begins, and door hangers will be distributed 48 hours prior to any activity. Work hours are from 7:00 AM to 5:30 PM, Monday through Friday. Vehicles left in the work zones risk being towed at the owner's expense.

    Schedules are subject to change due to unforeseen circumstances like mechanical breakdowns, weather conditions, and supplier material delays. Public Safety will always be a priority.

    Bulk trash and regular services will be unaffected; collections will occur early in the morning within the project areas. Please ensure bulk trash is placed out by 5 AM on Monday during your service week. Please ensure regular trash is placed out by 5 AM during your service week.



    Schedule

    CASHION BLK 1,2,3 – 1/2/2025

    GARDEN LAKES PARCELS 26,31 – 1/2/2025

    RANCHO SANTA FE PARCEL 19 – 1/2/2025

    COLDWATER SPRINGS PARCEL 8 – 1/2/2025

    DYSART RANCH – 1/3/2025

    CASITAS @ RANCHO SANTA FE – 1/3/2025

    ALTA @ RANCHO SANTA FE – 1/3/2025

    SANCTUARY PARCELS 1,2,3,4 – 1/6/2025

    HISTORICAL AVONDALE – 1/6/2025

    CRYSTAL GARDENS PARCELS 2A,2B,3,4 – 1/7/2025

    CW RANCH, STARLIGHT TRAIL – 1/8/20252

    CAMBRIDGE ESTATES – 1/8/2025


  • Avondale Blvd ADA Compliance Project: August - November, 2024 - This project has been completed.

    Share Avondale Blvd ADA Compliance Project: August - November, 2024 - This project has been completed. on Facebook Share Avondale Blvd ADA Compliance Project: August - November, 2024 - This project has been completed. on Twitter Share Avondale Blvd ADA Compliance Project: August - November, 2024 - This project has been completed. on Linkedin Email Avondale Blvd ADA Compliance Project: August - November, 2024 - This project has been completed. link
    This project has been completed.

    As part of the City of Avondale Pavement Preservation Program, the Avondale Public Works Department, in collaboration with Combs Construction, will be upgrading concrete ramps to ensure ADA compliance on Avondale Boulevard. This work is part of a larger resurfacing project scheduled for this summer on Avondale Boulevard. The project will commence south of I-10 and extend to Broadway Road, occurring from August 9th to August 17th. The entire project is expected to run until November 2.

    This work will involve some lane closures and restrictions, we will always maintain an open lane of traffic at the work zone. Appropriate signage will be posted before the start of the work. The work hours will be from 7 p.m. to 5 a.m., Monday through Friday, and possibly Saturday. Schedules are subject to change due to unforeseen circumstances such as mechanical breakdowns, weather conditions, and supplier material delays. Public safety is our top priority.

    For detailed information, call Public Works at 623-333-4487.


    Detailed Breakdown of Work

    Avondale Blvd Phase Two: August 9 - 15, 2024

    #1 ADA Ramps & Ped Poles at Whyman, August 9th – August 17th. Night Work

    #2 ADA Ramps at Durango, August 9th – August 17th. Night Work

    #3 ADA Ramps Pima NB, August 14th. Night Work

    #4 ADA Ramps Pima SB, August 15th. Night Work


    Avondale Blvd Phase Three: August 5 - 13, 2024

    #1 Ped Poles & Push Buttons Maricopa, August 5th - 6th – August 7th. Night Work

    #2 ADA Ramps Buchanan St, August 5th. Night Work

    #3 ADA Ramps at Civic Center, August 6th. Night Work

    #4 ADA Ramps Jefferson, August 7th. Night Work

    #5 ADA Ramps Coldwater Springs NB, August 8th – 13th. Night Work


    Avondale Blvd Phase Four: August 9 and 12, 2024

    #1 ADA Ramps Van Buren, August 9th. Night Work

    #2 Ped Push Button Roosevelt, August 12th. Night Work


  • Avondale Blvd Resurfacing Project: July - November 2024 - This project has been completed

    Share Avondale Blvd Resurfacing Project: July - November 2024 - This project has been completed on Facebook Share Avondale Blvd Resurfacing Project: July - November 2024 - This project has been completed on Twitter Share Avondale Blvd Resurfacing Project: July - November 2024 - This project has been completed on Linkedin Email Avondale Blvd Resurfacing Project: July - November 2024 - This project has been completed link
    CLOSED: This project has been completed

    As part of the City of Avondale Pavement Preservation Program, the Avondale Public Works Department, in collaboration with VSS International, will conduct a resurfacing project on Avondale Boulevard. The project will be executed in several stages, starting at Broadway Road and extending north to I-10, with work occurring both during the day and at night. This will involve lane closures and restrictions; however, an open lane of traffic in both northbound and southbound directions will always be maintained. Access to businesses will also be consistently maintained. This project will take place from July 29 to November 2.

    Appropriate signage will be posted before work begins, Monday through Friday, and potentially on Saturdays. Please note that schedules are subject to change due to unforeseen circumstances such as mechanical breakdowns, weather conditions, or supplier material delays. Public safety remains our top priority.

    For detailed information call Public Works at 623-333-4487.

    Project Rendering

    The new striping plan for Avondale Boulevard introduces a dedicated buffer lane alongside the bike lane, enhancing safety and accessibility for cyclists. This design prioritizes the separation of cycling traffic from vehicle lanes, promoting a more sustainable and community-friendly transportation option. The inclusion of these lanes aligns with our ongoing commitment to improving infrastructure and supporting active lifestyles in the community.


    Detailed Breakdown of Work


  • Glenarm Farms, Cape Seal Surface Treatment - This work has been completed

    Share Glenarm Farms, Cape Seal Surface Treatment - This work has been completed on Facebook Share Glenarm Farms, Cape Seal Surface Treatment - This work has been completed on Twitter Share Glenarm Farms, Cape Seal Surface Treatment - This work has been completed on Linkedin Email Glenarm Farms, Cape Seal Surface Treatment - This work has been completed link
    This has been completed

    The City of Avondale Public Works Department, in partnership with VSS International, will be undertaking Cape Seal Surface Treatment Project, this is a two-stage application project in the subdivision of Glenarm Farms as part of the FY25 pavement preservation program. This project is scheduled to take place from October 11, with the Chip Seal stage, October 24 to November 1 with the Micro Seal stage.

    Bulk trash services will be unaffected; collections will occur early in the morning within the project areas. Please ensure bulk trash is placed out by 5 AM on Monday during your service week.

    Expect lane restrictions and closures throughout this period. To minimize disruption, signage will be placed before work begins, and door hangers will be distributed 48 hours prior to any activity. Work hours are from 7:00 AM to 5:30 PM, Monday through Friday. Vehicles left in the work zones risk being towed at the owner's expense.

    Please note that the schedule may change due to unforeseen factors such as mechanical issues, weather conditions, or material supply delays. The safety of the public is our highest priority throughout this project.


    Project Schedule:

    Chip Seal - 10/10/2024

    Micro Seal - 10/25/2024 to 10/31/2024


  • Asphalt Repairs September 17th - 27th, 2024 - This Project is Completed

    Share Asphalt Repairs September 17th - 27th, 2024 - This Project is Completed on Facebook Share Asphalt Repairs September 17th - 27th, 2024 - This Project is Completed on Twitter Share Asphalt Repairs September 17th - 27th, 2024 - This Project is Completed on Linkedin Email Asphalt Repairs September 17th - 27th, 2024 - This Project is Completed link
    CLOSED: This work has been completed


    As part of the FY25 pavement preservation program, The City of Avondale Public Works Department and MR TANNER, will be completing asphalt repairs to the following subdivisions. This work is scheduled from September17th to September 27th. Expect lane restrictions throughout this period. To minimize disruption, signage will be placed before work begins, and door hangers will be distributed 48 hours prior to any activity. Work hours are from 7:00 AM to 5:30 PM, Monday through Friday. Vehicles left in the work zones risk being towed at the owner's expense.

    Schedules are subject to change due to unforeseen circumstances like mechanical breakdowns, weather conditions, and supplier material delays. Public Safety will always be a priority.

    Bulk trash services will be unaffected; collections will occur early in the morning within the project areas. Please ensure bulk trash is placed out by 5 AM on Monday during your service week.


    Schedule

    Del Rio Ranch 9/17/ 24

    Glenhurst, 9/17/24

    Glenarm Farms, 9/17/24

    Westwind, 9/17/24

    Durango, 9/18/24

    Ranchettes Estates, 9/18/24

    Rio Vista, 9/18/24

    Rosevelt Park, 9/19/24

    Irving Pl, Hills Subdivision, 9/19/24

    Coldwater Springs, 9/23/24

    Garden Trails, 9/23/24

    Rancho Santa Fe Parcel 19, 9/23/24

    Crystal Gardens, 9/23/24

    Tierra @ Rancho Santa Fe, 9/24/24

    Los Arbolitos, 9/24/24




  • Surface Treatment: May - June, 2024 *Schedule Revised 5/9/24*

    Share Surface Treatment: May - June, 2024 *Schedule Revised 5/9/24* on Facebook Share Surface Treatment: May - June, 2024 *Schedule Revised 5/9/24* on Twitter Share Surface Treatment: May - June, 2024 *Schedule Revised 5/9/24* on Linkedin Email Surface Treatment: May - June, 2024 *Schedule Revised 5/9/24* link
    CLOSED: This work has been completed.

    The City of Avondale Public Works Department, in collaboration with ViaSun, will be conducting a Surface Treatment project in selected subdivisions as part of the FY24 pavement preservation program. The project is scheduled to run from May 20th to June 19th.

    Bulk trash service will remain unaffected; services will be provided first thing in the morning in areas affected by the project. As a reminder, bulk trash much be placed out by 5 AM Monday morning the week of service.

    Lane restrictions and closures will occur during the duration of the project. To minimize disruption, signage will be installed ahead of the commencement of work, and door hangers will be distributed 48 hours before any activities begin. Work hours for the project are from 7:00 AM to 6:30 PM, Monday through Friday. Vehicles left in posted work zones may be towed at the owner's expense.

    It's important to note the schedule may be subject to change due to unpredictable factors such as mechanical malfunctions, weather conditions, and delays in receiving materials from suppliers. Ensuring the safety of the public remains our utmost priority throughout this process.

    Project Sequence (Schedule Revised 5/9/24)

    Dysart Ranch - North of Osborn Rd -East of 132nd Ave. Work dates 5/28/24 -5/31/24

    Rancho Santa Fe - South of Encanto, Work dates 5/28/24 – 5/31/24

    Garden Lakes – Unit 3 Lot 1-52 TR A & C and the Estates at Garden Lakes. Work dates 6/3/24 – 6/10/24.

    Upland Park, Work dates 6/3/24 – 6/10/24

    Crystal Park Estates, Work dates 6/3/24 – 6/10/24

    Palm Gardens, Work dates 6/5/24 – 6/14/24

    Rancho Santa Fe - North of Encanto and East of Santa Fe Trails, Work dates 6/4/24 – 6/14/24

    Las Palmeras West, Work dates 6/4/24 – 6/12/24

    Rancho Santa Fe Trail (Collector Rd), Work dates 6/11/24 – 6/13/24

    Coldwater Springs - Parcel 25 & 20, Work dates 6/11/24 -6/13/24

    Las Palmeras West, Work dates 6/17/24 – 6/21/24

    Field Crest, Work dates 6/17/24 – 6/21/24




  • Spring 2024 Jimmie Johnson Dr. / Indian Springs Rd. Resurfacing

    Share Spring 2024 Jimmie Johnson Dr. / Indian Springs Rd. Resurfacing on Facebook Share Spring 2024 Jimmie Johnson Dr. / Indian Springs Rd. Resurfacing on Twitter Share Spring 2024 Jimmie Johnson Dr. / Indian Springs Rd. Resurfacing on Linkedin Email Spring 2024 Jimmie Johnson Dr. / Indian Springs Rd. Resurfacing link
    CLOSED: This work has been completed.

    As part of the Fiscal Year 2024 pavement preservation program, the Avondale City Public Works Department, in collaboration with VSS, will be applying a surface treatment to two stretches of road: Jimmie Johnson Drive, from the bridge to El Mirage Road, and Indian Springs Road, from El Mirage Road to 133rd Avenue.

    Signage will be put up in advance to inform the public of the upcoming work. During the project, traffic control measures will be in place to ensure minimal delays. and work hours are from 7:00 AM to 4:30 PM. Please note that these schedules may change due to unforeseen issues, such as mechanical failures, adverse weather conditions, or delays in receiving materials.

    If there are any questions, please contact Gustavo Garcia at 623-333-4487.


  • Spring 2024 Crack Seal & Asphalt Repair

    Share Spring 2024 Crack Seal & Asphalt Repair on Facebook Share Spring 2024 Crack Seal & Asphalt Repair on Twitter Share Spring 2024 Crack Seal & Asphalt Repair on Linkedin Email Spring 2024 Crack Seal & Asphalt Repair link
    CLOSED: This work has been completed.

    As part of the FY24 pavement preservation program, The City of Avondale Public Works Department will be completing minor asphalt repairs and applying a Crack Seal treatment from early March to Mid-May during the work hours of 7am to 4:30pm, Monday - Friday. This process with have minimal traffic delays, and signage will be posted at the locations prior to work. We ask residents and commuters to remain mindful of these signs and adhere to any temporary traffic controls. Vehicles remaining in posted work zones are subject to being towed at the owner’s expense. Efforts will be made to ensure that access to homes and businesses is maintained throughout the project duration.

    Maps detailing the project sequence have been included below. Schedules are subject to change due to unforeseen circumstances like mechanical breakdowns, weather conditions, and supplier material delays. Public Safety will always be the top priority in completing work.

    Project Sequence

    • Dysart Ranch - North of Osborn Rd -East of 132nd Ave. Work dates 3/11/24 -3/14/24

    • Las Palmeras West, Work dates 3/15/24 – 322/24

    • Rancho Santa Fe - North of Encanto and East of Santa Fe Trails, Work dates 3/25/24 – 4/3/24

    • Rancho Santa Fe - South of Encanto, Work dates 4/4/24 – 4/15/24

    • Rancho Santa Fe Trail (Collector Rd), Work dates 4/16/24 – 4/19/24

    • Palm Gardens, Work dates 4/22/24 – 4/23/24

    • Crystal Park Estates, Work dates 4/24/24 – 4/25/24

    • Garden Lakes – Unit 3 Lot 1-52 TR A & C and the Estates at Garden Lakes. Work dates 4/26/24 – 4/26/24

    • Upland Park, Work dates 4/29/24 – 5/2/24

    • Coldwater Springs - Parcel 25 & 20, Work dates 5/3/24 -5/7/24

    • Field Crest, Work dates 5/8/24 – 5/13/24


Page last updated: 17 Mar 2025, 02:13 PM